Republic of Liberia
ENVIRONMENTAL PROTECTION AGENCY
Monrovia, Liberia
(CONSULTING SERVICES)
NAME OF PROJECT: ENHANCING CLIMATE INFORMATION SYSTEMS FOR
RESILIENT DEVELOPMENT (LIBERIA CIS PROJECT)
Assignment Title: Consultancy for Professional Services for Supervision and
Monitoring of the Renovation of the Liberia National Meteorological Station
Financing Agreement reference:
Project ID No:
Reference No.
Issue Date: Thursday, March 12, 2026
End Date: Thursday, March 26, 2026
- Background
The Environmental Protection Agency (EPA) in Liberia was created by an act of theĀ Legislature on November 26, 2002, and published as a handbill on April 30, 2003, toĀ ensure sound environmental management and sustainable use of natural resources. TheĀ EPA functions to ensure long-term economic prosperity through sustainable developmentĀ and establish a legal framework for environmental management.
The EPA received funding from the Green Climate Fund to implement a five-year projectĀ called “Enhancing Climate Information Systems for Resilient Development in Liberia” (theĀ Liberia CIS Project).
The Liberia CIS Project is a US$11,431,969 GCF, AFDB, and GOL-funded project thatĀ aims to increase the resilience of Liberiaās population and infrastructure to climateĀ change.
In particular, the project will strengthen the countryās adaptive capacities toĀ integrate better long-term climate risk reduction and adaptation measures in nationalĀ planning and development through the development of a well-functioning Multi-HazardĀ Impact-Based Forecasting and Early Warning System (MH-IBF-EWS).
The implementation of the project will entail training and equipping the existing LiberiaĀ Meteorological Service (LMS), Liberia Hydrological Service (LHS), EnvironmentĀ Protection Agency (EPA) and National Disaster Management Agency (NDMA) to collectĀ weather and climate data; introduce and maintain modelling, forecast weather events andĀ provide early warnings systems; and scale-up evidence-based climate-informed decisionĀ making, planning, and response actions Countrywide. The objective of the project is toĀ strengthen Liberiaās climate-related observation and monitoring capabilities, earlyĀ warning and early action systems, and other environment-related information systems.Ā The objective seeks to drive a paradigm shift towards evidence-based climate-informedĀ decision-making, planning, and response by integrating green growth, environmentalĀ resilience, and adaptation into national development planning through effective climateĀ information systems in Liberia.
- Purpose of the Consultancy
The purpose of this consultancy is to provide professional supervision and monitoringĀ services for the renovation of the Liberia National Meteorological Station at the RobertsĀ International Airport (RIA). This station is a critical component of Liberiaās national climateĀ and weather monitoring infrastructure and plays a key role in generating accurateĀ meteorological data to support evidence-based planning and risk reduction acrossĀ sectors. Moreover, this consultancy aligns with the objectives of the Climate InformationĀ System (CIS) Project, which seeks to enhance Liberiaās climate resilience through theĀ development of reliable, accessible, and user-driven climate services. By ensuring theĀ quality, safety, and timely execution of the renovation works, this consultancy willĀ contribute directly to strengthening national climate service delivery, improving earlyĀ warning systems, supporting agriculture, infrastructure development, aviation safety, andĀ disaster preparedness.
- The Scope of the Services to be performed
The Consultant shall provide a comprehensive professional services for the supervisionĀ and monitoring of the renovation works at the Liberia National Meteorological StationĀ located at the Roberts International Airport (RIA). The services aim to ensure that allĀ construction activities are implemented in full compliance with the approved architecturalĀ and engineering designs, technical specifications, environmental and safety standards,Ā project timelines, and budgetary provisions.
3.1Technical Review and Site Familiarization
⢠Review approved design drawings where available and or develop the required
design based on the needs of the beneficiary entity, specifications, bills ofĀ quantities (BoQs), and work schedules.
⢠Conduct a pre-renovation site assessment to understand the scope and sequence of renovation activities.
3.2Construction Supervision and Monitoring
⢠Provide day-to-day technical supervision to monitor the contractorās adherence toĀ design and quality standards.
⢠Ensure compliance with agreed timelines and identify potential risks or delays early.
⢠Maintain a daily site log of activities, progress, and any deviations.
⢠Monitor the quality of materials and workmanship to meet project standards.
⢠Track progress against the schedule and budget, and report any delays or issues.
3.3Quality Control and Material Inspection
⢠Monitor and inspect materials and construction methods to ensure conformance with approved standards.
⢠Recommend remedial measures for any non-conforming work or materials.
⢠Ensure that the contractor implements and adheres to proper occupational health, safety, and environmental practices on-site.
⢠Monitor the application of safety procedures and respond to any incident reports.
⢠Monitor compliance with national and international health and safety standards at the construction site.
⢠Ensure that the contractor implements an effective safety management plan, including the use of PPEs, site hazard controls, and emergency response procedures.
⢠Report and follow up on any environmental or safety incidents.
⢠Facilitate regular site meetings between the contractor, the EPA/CIS Project Implementation Unit (PIU), and other relevant stakeholders.
3.4Progress Monitoring and Reporting
⢠Track the progress of construction activities against the approved schedule and identify any delays or bottlenecks.
⢠Coordinate and facilitate weekly site meetings with the contractor and project team to review progress and resolve issues.
⢠Prepare and submit monthly supervision reports highlighting progress, challenges, quality status, safety compliance, and recommendations.
⢠Maintain photo documentation of all key stages of the renovation works.
3.5Certification and Payment Verification
⢠Verify and certify contractorās interim payment requests by validating the volumeĀ and quality of completed works.
⢠Prepare technical assessments to support disbursement approvals and submit to the CIS Project Management Unit.
⢠Conduct a comprehensive review and certification of final works before recommending final payment.
3.6Final Inspection and Handover
⢠Lead the final inspection of the completed renovation works together with EPA/CIS representatives.
⢠Prepare a punch list of any outstanding or defective works and supervise corrective actions.
⢠Submit a final completion report including as-built drawings, warranty documents, and operation and maintenance manuals (if applicable).
⢠Certify completion of works and assist with the handover process, including the preparation of the final supervision report.
Minimum Qualifications, Skills, and Experience:
The completion of this work dependent on an Individual. The selected person should haveĀ a minimum of a Bachelorās degree in Civil Engineering, Structural Engineering, BuildingĀ Construction, Architectural Engineering or other relevant related field. The successfulĀ Individual should have at least 8 years of cumulative extensive experience in construction,Ā supervision and monitoring of civil engineering project.Ā Also, the individual should have the following:
⢠Be a member of the Society of Engineers in Liberia
⢠Be a license engineers by the Ministry of Public Works.
⢠Experience in supervising building construction/renovation projects in Liberia.
⢠Knowledge of Liberian building codes and international standards
⢠Strong project management and reporting skills.
⢠Be a good communicator and team player
Professionalism: the ability to make ad-hoc changes as and when the need arises; theĀ ability to perform under stress; and the willingness to keep flexible working hours.
Duty Station:Ā Margibi County
Start Date:Ā Wednesday, April 1, 2026
End Date:Ā Wednesday, November 11, 2026
Duration of Assignment:Ā 32 Weeks
The Environmental Protection Agency (EPA) now invites eligible individual consultants toĀ indicate interest in providing these services by submitting their Curriculum Vitae (CV),Ā demonstrating experience in performing similar assignments with references, andĀ showing responsiveness to the qualificationās requirements outlined in this REOI.
Eligibility criteria and the selection procedure shall be in accordance with the AfricanĀ Development Bankās āProcurement Policy Framework for Bank Group Funded OperationsāĀ October 2015, which is available on the Bankās website at http://www.afdb.org.
Further information can be obtained at the address below during office hours, i.e. fromĀ 0900 to 1700 hours (GMT) on working days.
Expressions of interest must be delivered in a written form to the address below by eitherĀ hard copy or email by Thursday, March 26, 2026 @ 1700 hours (GMT) and mentionĀ āConsultancy for Professional Services for Supervision and Monitoring of the RenovationĀ of the Liberia National Meteorological Station.ā
Attn. Williemai Digker
CIS Procurement Officer
Environmental Protection Agency
Monrovia, Liberia
E-mail: info.cis2025@gmail.com

